Projects

Company reference list: 74 projects since 2013. Construction supervision, post-construction quality and quantity inspection, detailed design and consulting for international financial institutions, public and private clients.

    1. No. 1

      Post-Construction Quality and Quantity Inspection of international all-season resort "Chimyon".

      Client
      JSC Regional Electricity Networks
      Location
      Tashkent region
      Project partners
      Norma Qurilish Konsalting LLC
      Team
      1 staff · 1 person-months
      Details
      • Construction Consultancy Services –
      • Determining the conformity of the quality of construction work with the current standards and rules;
      • Determining the actual volume of work performed and materials used;
      • Determining the conformity of the actual volume of work performed with the volume of work specified in the acts of acceptance of completed work;
      • Checking the operational readiness of the facility;
      • Checking the availability and costs of equipment used during installation.
      • Cost of construction and installation works (C&I): 32 459 302 838 Uzbek soums
    2. No. 2

      Horezm Regional Roads – Phase ii Uzbekistan – Development of TOR

      Client
      EBRD and Road Fund of Uzbekistan
      Location
      Khorezm region
      Project partners
      CEG (India)
      Team
      2 staff · 12 person-months
      Details
      • Construction Consultancy Services –
      • Conducting a feasibility study in accordance with EBRD standards;
      • Conducting a Category A environmental and social impact assessment;
      • Providing procurement support for the supervision contract and construction works;
      • Assessing compliance with the Paris Agreement and climate resilience;
      • Conducting an independent road safety audit during the design phase.
    3. No. 3

      Construction Supervision for "Construction of the administrative building of the Electrical Networks in Nurafshon city"

      Client
      JSC Regional Electricity Networks
      Location
      Tashkent region
      Team
      2 staff · 6 person-months
      Details
      • Construction Consultancy Services –
      • Determining the quality of construction work in accordance with current standards and regulations;
      • Determining the actual volume of work performed and the documents;
      • Monitoring compliance with construction and installation technology;
      • Reviewing documents for the purpose of submitting them to the work and state commissions.
    4. No. 4

      Post-Construction Quality and Quantity Inspection of Nurafshon City House residential complex

      Client
      Nurafshon City House
      Location
      Tashkent region
      Team
      3 staff · 1 person-months
      Details
      • Construction Consultancy Services –
      • Determining the conformity of the quality of construction work with the current standards and rules;
      • Determining the actual volume of work performed and materials used;
      • Determining the conformity of the actual volume of work performed with the volume of work specified in the acts of acceptance of completed work;
      • Checking the availability and costs of equipment used during installation.
      • Cost of construction and installation works (C&I): 17 933 583 493 Uzbek soums
    5. No. 5

      Construction Supervision for "Construction of a network of gas stations" located in Tashkent city, Bektemir district.

      Client
      HUBSTER
      Location
      Tashkent
      Team
      4 staff · 3 person-months
      Details
      • Construction Consultancy Services –
      • Determining the quality of construction work in accordance with current standards and regulations;
      • Determining the actual volume of work performed and the documents;
      • Monitoring compliance with construction and installation technology;
      • Reviewing documents for the purpose of submitting them to the work and state commissions.
    6. No. 6

      Construction Supervision for "Warehouse construction" located in Tashkent city, Sergeli district.

      Client
      AB GROUP STARS
      Location
      Tashkent
      Team
      7 staff · 3 person-months
      Details
      • Construction Consultancy Services –
      • Determining the quality of construction work in accordance with current standards and regulations;
      • Determining the actual volume of work performed and the documents;
      • Monitoring compliance with construction and installation technology;
      • Reviewing documents for the purpose of submitting them to the work and state commissions.
    1. No. 8

      Post-Construction Quality and Quantity Inspection of 26-storey Asaka Tower, located in Shaykhontokhur district, Yangi Tashkent street, Yangi Tashkent passage

      Client
      JSC Asakabank
      Location
      Tashkent
      Team
      6 staff · 2 person-months
      Details
      • Construction Consultancy Services –
      • Determining the conformity of the quality of construction work with the current standards and rules;
      • Determining the actual volume of work performed and materials used;
      • Determining the conformity of the actual volume of work performed with the volume of work specified in the acts of acceptance of completed work;
      • Checking the operational readiness of the facility;
      • Checking the availability and costs of equipment used during installation.
      • Cost of construction and installation works (C&I): 1,041,938,850,991 Uzbek soums
    2. No. 7

      Analysis of design and estimate documentation for the project: "Construction of a recreation area" located in Yusufkhon street, house No. 221, MFY Navobot, Bostanlik district, Tashkent region"

      Client
      MEDIVA RESORT
      Location
      Tashkent region
      Team
      6 staff · 1 person-months
      Details
      • Construction Consultancy Services –
      • Determining compliance of project quality with applicable codes and regulations;
      • Conducting analysis of the submitted project and estimate documentation;
      • Preparing a written list of identified comments, recommendations, and proposals for project adjustments;
      • Providing oral consultation and clarification regarding the issued expert opinion.
    3. No. 10

      Post-Construction Quality and Quantity Inspection of Hotel complex "Karakalpakstan", located in the Chingeldi makhalla of the Mirzo-Ulugbek district of the city of Tashkent, in close proximity to the park "New Uzbekistan".

      Client
      BRB-INVEST DEVELOPMENT LLC
      Location
      Tashkent
      Team
      3 staff · 1 person-months
      Details
      • Construction Consultancy Services –
      • Determining the conformity of the quality of construction work with the current standards and rules;
      • Determining the actual volume of work performed and materials used;
      • Determining the conformity of the actual volume of work performed with the volume of work specified in the acts of acceptance of completed work;
      • Checking the operational readiness of the facility;
      • Checking the availability and costs of equipment used during installation.
      • Cost of construction and installation works (C&I): 47,000,000,000 Uzbek soums
    4. No. 9

      Construction Supervision of the project "Production of food products, soft and energy drinks", located in Tashkent region, Akhangaran city in Special industrial zone "Angren", Tut Makhalla Citizens Assembly, str. Bunyodkor, 334

      Client
      Zalal Mowafaq FZ
      Location
      Tashkent region
      Team
      2 staff · 6 person-months
      Details
      • Construction Supervision of the project "Production of food products, soft and energy drinks", located in Tashkent region, Akhangaran city in Special industrial zone "Angren", Tut Makhalla Citizens Assembly, str. Bunyodkor, 334
    5. No. 11

      Construction Supervision and Post-Construction Quality and Quantity Inspection of 7 construction sites under the project "Modernization of agriculture of Uzbekistan"

      Client
      International Center for Strategic Development and Research in the Field of Food and Agriculture under the Ministry of Agriculture of the Republic of Uzbekistan
      Location
      Andijan, Fergana, Samarkand, Qashkadarya, Tashkent region and Tashkent city
      Team
      7 staff · 12 person-months
      Details
      • Construction Consultancy Services –
      • Determining the conformity of the quality of construction work with the current standards and rules;
      • Determining the actual volume of work performed and materials used;
      • Determining the conformity of the actual volume of work performed with the volume of work specified in the acts of acceptance of completed work;
      • Checking the operational readiness of the facility;
      • Checking for the presence of volumes and costs for unfinished construction and installation work.
      • Checking the availability and costs of equipment used during installation.
      • Carrying out control measurements and technical supervision at the Customer's facility.
      • Cost of construction and installation works (C&I): 99,386,639,856 Uzbek soums
    1. No. 23

      TA 9987-UZB: Road Subsector Development Strategy and Action Plan Capacity Building Program and Institutional Strengthening of State-Owned-Enterprises in Road Management

      Client
      ADB & Committee for Roads
      Location
      Tashkent
      Financing
      ADB
      Project partners
      Roughton International ltd (UK)
      Team
      12 staff · 28 person-months
      Details
      • Implementation of a new road asset management system;
      • Development of large scale public-private partnership projects;
      • Review and modernization of road design and maintenance standards; and
      • Production of guidance and manuals to assist the inclusion of modern methods in road safety, natural hazard mitigation, pavement design and maintenance.
    1. No. 24

      Early Scoping, Diagnostic and Preliminary Project Definition in Urban Transport in the City of Tashkent

      Client
      TashShaharTransXizmat
      Location
      Tashkent
      Financing
      IFC
      Project partners
      Steer Davies & Gleave Limited (Germany)
      Team
      5 staff · 5 person-months
      Details
      • Urban transport sector diagnostic and project screening in city of Tashkent and its agglomeration and propose business models appropriate for enabling and enhancing conditions for private sector participation and investment.
      • Review the possibility of supporting the development of a commercially viable and sustainable public transport system in the city of Tashkent, commercialization of the state-owned transport operator ToshShaharTransXizmat (TShTX) and assisting in the renewal of its rolling stock.
    2. No. 25

      Land surveys for construction of water supply networks in Yangikurgan district and Namangan city

      Client
      Namangan Suv ta'minot
      Location
      Namangan
      Financing
      OPEC Fund
      Project partners
      DOHWA Engineering (Korea)
      Team
      20 staff · 40 person-months
      Details

      Survey of the followings objects:

      • Water supply networks of the villages of Navkent, Rovot, Sangiston, Yangikurgon, Radivon, Kizarik, Korapolvon, Gaiston, Kizilkiyok, Rovut, Duldi with a total length of 51.2 km;
      • Reconstruction of water supply networks of the villages of Navkent, Rovot, Sangiston, Yangikurgon, Radivon, Kizarik, Korapolvon, Gaiston, Kizilkiyok, Rovut, Duldi with a total length of 18.7 km;
      • Water supply networks in Namangan city with a total length of 52.5 km.
    3. No. 12

      Detailed design for Construction of WWTP with a capacity of 1000 m3/day and sewerage networks in makhalla "Muruvvat" in Bagdad district of Fergana region

      Client
      Single Customer Service under the Municipality of Fergana region
      Location
      Fergana region
      Financing
      State budget
      Project partners
      Royal Dizayn Loyiha Ltd. (Uzbekistan)
      Team
      6 staff · 30 person-months
      Details

      The detailed design documentation for construction of waste water treatment plant with a capacity of 1000 m3/day was developed based on the topographical survey with scale of M1:1000, which included design of the following:

      • Waste water treatment facility;
      • Checkpoint;
      • Reservoirs;
      • Transformer substation;
      • Diesel power plant;
      • Restroom
    4. No. 13

      Detailed design for Construction of 3,5 km sewerage networks in massif "Muruvvat" in Bagdad district of Fergana region

      Client
      Single Customer Service under the Municipality of Fergana region
      Location
      Fergana region
      Financing
      State budget
      Project partners
      Royal Dizayn Loyiha Ltd. (Uzbekistan)
      Team
      4 staff · 30 person-months
      Details

      The following types of work were foreseen within the project:

      • Construction of ABK building;
      • Construction of aerated sand trap, silt platform;
      • Construction of the building for waste water treatment plant;
      • Construction of checkpoint;
      • Laying of 3,5 km of sewerage network
    5. No. 22

      Detailed design for Construction of water supply network for multi-dwelling units and social facilities in Muruvvat massif in Bagdad district of Fergana region

      Client
      Fergana Regional Territorial Administration of UE "Engineering company for water supply and sewerage facilities construction"
      Location
      Fergana region
      Financing
      State budget
      Project partners
      Royal Dizayn Loyiha Ltd. (Uzbekistan)
      Team
      3 staff · 30 person-months
      Details
      • Development of detailed design documentation for construction of 5 km water supply network for multi-dwelling units and social facilities in Muruvvat massif in Baghdad district of Fergana region
    6. No. 15

      Detailed design for Construction of water supply networks in makhalla "Gurtepa" in Zaamin district of Jizzakh region

      Client
      Jizzakh Regional Territorial Administration of UE "Engineering company for water supply and sewerage facilities construction"
      Location
      Jizzakh region
      Financing
      State budget
      Project partners
      Royal Dizayn Loyiha Ltd. (Uzbekistan)
      Team
      6 staff · 10 person-months
      Details

      The following types of work were foreseen within the project:

      • Construction of water tower with volume of 25 m3 and height of 15 m;
      • Construction of building for bactericidal installation;
      • Laying of external water supply networks;
      • Construction of 4 kV and 10 kV power lines
    7. No. 16

      Detailed design for Construction of the main water supply network "Zomin-Shirin"

      Client
      Jizzakh Regional Territorial Administration of the unitary enterprise "Engineering company for water supply and sewerage facilities construction "
      Location
      Jizzakh region
      Financing
      State budget
      Project partners
      Royal Dizayn Loyiha Ltd. (Uzbekistan)
      Team
      6 staff · 10 person-months
      Details

      Within the framework of the project, the detailed design documents for construction of the main water supply network “Zomin-Shirin” were developed, which included the following works:

      • Laying of external water supply network with length of 10.4 km;
      • Construction of water chamber from monolithic reinforced concrete M300;
      • Ensuring water supply to makhallas: "Hulkar", "Bogishamol", "Mugol" and "Shirin".
    8. No. 14

      Detailed design for Construction of water facility and water supply networks in industrial zone “Guliston” in Bagdad district of Fergana region

      Client
      Fergana Regional Territorial Administration of UE "Engineering company for water supply and sewerage facilities construction"
      Location
      Fergana region
      Financing
      Fund for Development of Water Supply and Sewerage Systems under the Ministry of Finance
      Project partners
      Royal Dizayn Loyiha Ltd. (Uzbekistan)
      Team
      6 staff · 30 person-months
      Details

      The following types of work were foreseen within the project:

      • Drilling of 1 horizontal artesian well
      • Construction of new water tower with volume V - 25 m3 and height N - 19.4 m.
      • Construction of building for bactericidal equipment.
      • Replacement of pipelines with polyethylene pipes
      • Laying around the building of concrete slab: thickness - 80 mm and width - 0.7 m.
    9. No. 19

      Detailed design for Construction of water facility and water supply networks in the industrial zone "Yuldosh-1" on the territory of makhalla "Navruz" in Margilan city, Fergana region

      Client
      Fergana Regional Territorial Administration of UE "Engineering company for water supply and sewerage facilities construction"
      Location
      Fergana region
      Financing
      Fund for Development of Water Supply and Sewerage Systems under the Ministry of Finance
      Project partners
      Royal Dizayn Loyiha Ltd. (Uzbekistan)
      Team
      6 staff · 22 person-months
      Details

      The aim of the project was to construct the water intake and water supply networks in the industrial area. In view of this, the following works were performed:

      • Laying of polyethylene pipes with diameter of 110 mm;
      • Construction of water tower with volume of 25 m3 and height of 19.4 m;
      • Construction of building for bactericidal equipment;
      • Installation of water softening equipment (inside the container)
    10. No. 20

      Detailed design for Construction of water facility and water supply networks in the industrial zone "Yuldosh-2" on the territory of makhalla "Navruz" in Margilan city, Fergana region

      Client
      Fergana Regional Territorial Administration of UE "Engineering company for water supply and sewerage facilities construction"
      Location
      Fergana region
      Financing
      Fund for Development of Water Supply and Sewerage Systems under the Ministry of Finance
      Project partners
      Royal Dizayn Loyiha Ltd. (Uzbekistan)
      Team
      6 staff · 22 person-months
      Details

      The aim of the project was to construct the water intake and water supply networks in the industrial area. In view of this, the following works were performed:

      • Laying of polyethylene pipes with diameter of 110 mm;
      • Construction of water tower with volume of 25 m3 and height of 19.4 m;
      • Construction of building for bactericidal equipment;
      • Installation of water softening equipment (inside the container)
    11. No. 29

      Post-Construction Quality and Quantity Inspection of the administrative building of SAR airline, located at Kum-Arik str., Tashkent city

      Client
      Uzbekistan Helicopters Ltd.
      Location
      Tashkent
      Team
      1 staff · 1 person-months
      Details
      • Post-Construction Quality and Quantity Inspection Services
    12. No. 28

      Construction Supervision of the facilities of Daryo bo'yi Business City

      Client
      Daryo bo'yi Business City
      Location
      Tashkent
      Team
      1 staff · 15 person-months
      Details
      • Technical supervision for construction of the facility located at the address: Tashkent, Bektemir district, THAY, Chirchik river
    13. No. 27

      Land surveys for Improving the water supply of the villages of Zarkent, Khodikent, Iskovot, Yoshlik and Namangan city project

      Client
      Namangan Suvtaminot
      Location
      Namangan
      Financing
      OPEC Fund
      Project partners
      DOHWA Engineering (Korea)
      Team
      20 staff · 40 person-months
      Details

      Survey of the followings objects:

      • Conduit from “Zarkent” WIS to “Zarkent” WDU with a length of 1.1 km;
      • Main conduit from Zarkent” WIS to “Iskovot” WDU with a length of 13.7 km;
      • Water supply networks in the villages of Zarkent, Shilvi, Khodikent, Ghaznon, Iskovot and Salmon with a total length of 25.4 km;
      • Reconstruction of water supply networks of Zarkent, Shilvi, Khodikent, Uzak, Ghaznon, Iskovot and Salmon villages with a total length of 18.3 km.
      • Main conduit from “Bulokboshi” WIS to Duldi village with a length of 25.9 km;
      • Main conduit from point 1 to “Yoshlik” WDU with a length of 3.6 km.
    14. No. 26

      Detailed Design & Construction Supervision for the Improving the water supply of the villages of Zarkent, Khodikent, Iskovot, Bulokboshi, Yoshlik and Namangan city

      Client
      Namangan Suvtaminot
      Location
      Namangan
      Financing
      OPEC
      Project partners
      DOHWA Engineering (Korea)
      Team
      15 staff · 274 person-months
      Details

      Within the framework of the project, water intake structures (hereinafter “WIS”), water conduits, facilities for water distribution units (hereinafter “WDU”), water transmission and distribution infrastructure will be built to restore or provide potable water services for residents of Zarkent, Khodikent, Iskovot, Yoshlik and Namangan city of the Namangan region. In this regard, the project envisages:

      • Construction of water intakes and water distribution units
      • Reconstruction of 2 WDUs, including “Iskovot” in Yangikurgan district and “Mustakillikning 5 yilligi” in Namangan city;
      • Construction of water pipelines and water supply networks from “Zarkent” water intake
      • Construction of water pipelines and water supply networks from “Yoshlik” WDU (Namangan city)
    15. No. 31

      Detailed Design & Technical Supervision for Construction of water supply system in Bunyodkor makhalla of Namangan region

      Client
      Namangan suv ta'minot
      Location
      Namangan
      Financing
      Ministry of Finance
      Team
      6 staff · 60 person-months
      Details
      • Drilling of 8 wells at Bulokboshi field in Yangikurgan district;
      • Construction of “Bulokboshi” water distribution unit with 2 water reservoirs of 5,000 m3;
      • Construction of D-700mm main water conduit from Bulokboshi WDU to Yoshlik with length of 20.8 km;
      • Construction of D-500mm main water conduit from Yoshlik WDU to Mustakillik 5 Yilligi WDU with length of 11.0 km;
      • Construction of Yoshlik WDU with 2 reservoirs of 5,000 m3;
      • Construction of 43 km water supply network in Bunyodkor makhalla.
    1. No. 32

      Construction supervision of Dealer Center Reconstruction in accordance with Volkswagen corporate standards

      Client
      Sergeli Avtotexxizmat Ltd.
      Location
      Tashkent
      Team
      1 staff · 1 person-months
      Details
      • Construction supervision at the Client's facility: reconstruction of the existing dealer centre building of Sergeli Avtotexxizmat Ltd. to Volkswagen corporate standards.
      • Cost of construction and installation works: 7,000,000,000 Uzbek soums
    2. No. 21

      Detailed design for Development of sewerage system in Jizzakh city of Jizzakh region, zone "A"

      Client
      Akelik Group Ltd.
      Location
      Jizzakh region
      Financing
      ADB
      Project partners
      Royal Dizayn Loyiha Ltd. (Uzbekistan)
      Team
      4 staff · 180 person-months
      Details

      Within the framework of the project financed by the Asian Development Bank, the following works were planned:

      • Construction of the building of diesel power plant;
      • Construction of the building of the sewage pumping station;
      • Installation of 40 kVA transformer substation, Unit Transformer Substation and laying 0.4 / 10 kV power lines
      • Reconstruction and construction of 28.86 km of urban collectors and pumping stations
      • Taking measures for environmental protection
    3. No. 33

      Construction Consultancy Services - Administrative Building Reconstruction

      Client
      JSC Uzbekistan Republican Currency Exchange
      Location
      Tashkent
      Team
      1 staff · 1 person-months
      Details
      • Construction Consultancy Services - Administrative Building Reconstruction
    4. No. 17

      Uzbekistan Regional Airports PPP Options

      Client
      World Bank Global Financial Financing Facility (GIF)
      Location
      Urgench, Bukhara, Nukus, Fergana, Namangan, Termez, Navoi, Andijan, Karshi
      Project partners
      STEER (Germany)
      Team
      3 staff · 9 person-months
      Details
      • Airport planning, finance and implementation to advice on regional airports in Uzbekistan, with the objective of scoping for Private-Public Participation (PPP) options.
      • The objective of the assignment is to conduct a scoping exercise for regional airports in Uzbekistan, in order to identify opportunities for Public Private Participation in the following airports: Urgench, Bukhara, Nukus, Fergana, Namangan, Termez, Navoi, Andijan, Karshi
    1. No. 34

      Construction Supervision Services - Cottage Reconstruction

      Client
      Administration for State Residency and Organizations Service under Administration of the President of RUz
      Team
      1 staff · 1 person-months
      Details
      • Technical Supervision Services - Cottage Reconstruction
    2. No. 35

      TA-9292 REG: Strengthening Project Preparation Capacity in Asia and the Pacific – Supporting Preparation of Infrastructure Projects with Private Sector Participation in Asia Pacific (Subproject 4) - #1 UZB: Technical Firm (Sherabad Solar IPP) (49407-005)

      Client
      ADB
      Location
      Surkhandarya
      Project partners
      Suntrace GmbH
      Team
      4 staff · 7 person-months
      Details

      Preparation and tender of a c. 100 MW solar IPP project (with potential storage component) around the cities of Sherabad, Muzrabad and Angor in the Surkhandarya region, by:

      • Assisting the Client in all technical aspects relevant to the update of the FS and finalize the technical specifications of the Project; and,
      • Assisting the Client in the tendering / procuring of the Project from a technical perspective.
    3. No. 36

      Construction Supervision Services for Navoi International Airport Modernization - Phase 2

      Client
      Navoi International Airport Ltd.
      Location
      Navoi city
      Project partners
      Not any
      Team
      1 staff · 2 person-months
      Details
      • Construction Supervision Services for Navoi International Airport Modernization - Phase 2
    4. No. 37

      Construction Supervision Services - Construction of Multifunctional Complex within the territory of TASHKENT CITY International Business Center - Lot No. 4

      Client
      Universal Packing Masters Ltd.
      Location
      Tashkent city
      Team
      6 staff
      Details
      • Technical supervision at the Customer's site: “Construction of a multifunctional complex on the territory of the TASHKENT CITY International Business Center Lot No. 4”.
    5. No. 18

      Detailed design for Reconstruction of external sewerage networks and treatment plant with a capacity of 3000 m3/day in Markhamat district of Andijan region

      Client
      Andijan Regional Administration for Water Supply and Sewerage Facilities Construction
      Location
      Andijan region
      Financing
      State budget
      Project partners
      Royal Dizayn Loyiha Ltd. (Uzbekistan)
      Team
      6 staff · 90 person-months
      Details

      Within the framework of the project, the detailed design documents were developed for the reconstruction of external sewerage networks and treatment plant with a capacity of 3000 m3 / day in Markhamat district of Andijan region, which included the following works:

      • Construction of aeration and equalization reservoirs;
      • Construction of ABK building;
      • Construction of aerated sand trap, silt platform;
      • Construction of the building for waste water treatment plant;
      • Construction of checkpoint
    6. No. 40

      Technical Audit of Housing Construction and Adjacent Infrastructure (access and on-site roads, water supply system) in Bukhara, Namangan, Andijan, Jizzakh, Navoi and Surkhandarya regions

      Client
      Islamic Development Bank & Qishloq Qurilish Bank
      Location
      Andijan, Fergana, Namangan cities
      Project partners
      National Office For Engineering and Reconstruction
      Team
      7 staff · 45 person-months
      Details

      The scope of the project includes review of construction of:

      • 6,404 modern typical houses,
      • 110.5 km of access and on-site roads,
      • 197.8 km of access and inner water-supply system in 2017-2019
    7. No. 38

      Post-Construction Quality and Quantity Inspection of Diagnostic Center, Film Club, Sewing Factory and Training Center, located in Karakul District of Bukhara Region

      Client
      Gullar Chexrasi ltd.
      Location
      Bukhara region
      Financing
      Gullar chehrasi Ltd
      Details
      • Carrying out control measurement at the customer's site located in Bukhara Region, Karakulsky District, SSG Pakhtakor, street. M. Ulugbek
    8. No. 39

      Regional Roads Development Project in Andijan, Fergana and Namangan regions

      Client
      World Bank & Road Fund of Uzbekistan
      Location
      Andijan, Fergana, Namangan cities
      Project partners
      Roughton International (Great Britain)
      Team
      39 staff · 742 person-months
      Details
      • Review the Design and the Bidding Documentation (BD) to ensure they allow safe and smooth construction;
      • assist the Republican Road Fund under Ministry of Finance (RRF) (“the Client”) in administering the contracts and supervising the construction works to ensure their quality and timely completion;
      • ensure environmental protection and social safeguards are properly implemented in accordance with the designs in the project roads.
    9. No. 41

      Construction Supervision of JSC ZIRAAT BANK UZBEKISTAN Premises Repair in Samarkand city

      Client
      JSC Ziraat Bank Uzbekistan
      Location
      Samarkand city
      Team
      1 staff · 4 person-months
      Details
      • Engineering supervision for Construction and Repair of the Building of JSC ZIRAAT BANK UZBEKISTAN in Samarkand city
    10. No. 42

      Post-Construction Quality and Quantity Inspection Services - Reconstruction of the Bazaar ‘Zomin Dekhkan Bozori' in Zaamin district of Jizzakh region

      Client
      NBU Bunyodkor Invest Ltd. Directorate for Markets Construction
      Location
      Jizzakh region
      Team
      3 staff · 6 person-months
      Details
      • Construction supervision at the customer's site.
    11. No. 30

      Post-Construction Quality and Quantity Inspection of the facilities in Jizzakh region

      Client
      PJSB Trustbank
      Location
      Tashkent
      Team
      5 staff · 25 person-months
      Details
      • Post-Construction Quality and Quantity Inspection Services
    12. No. 43

      Construction Consulting Services for ‘Mehrli Yulduz', ‘Sitora Ta'lim', ‘Yosh Bulbulchalar', ‘Bahora Mexribonu', ‘Diyora-Shodiya', ‘Dunyo Bolallari', ‘Mironshoh-Amirshoh' Kindergartens Inspection

      Client
      Trustbank
      Location
      Jizzakh region
      Team
      1 staff · 1 person-months
      Details
      • Inspection control, preparation of the explanatory note, reconciliation report and act of the inspection control.
    1. No. 44

      Construction Supervision and Consultancy on Documentation to be submitted to Working and State Committee for “Fuel and lubricant warehouse of 4000 m3” and “60 room hotel with catering”

      Client
      SUE Navoi International Airport
      Location
      Navoi
      Team
      1 staff · 1 person-months
      Details
      • Construction supervision on the Customer's site: “Fuel and lubricant warehouse of 4000 m3” and “60-roomed hotel with catering”
    2. No. 45

      Engineering supervision for Construction of Airport Passenger Terminal with a capacity of 400 passengers/hour within the territory of SUE Termez International Airport

      Client
      SUE Termez International Airport
      Location
      Termez
      Team
      1 staff · 3 person-months
      Details
      • Engineering supervision for Construction of Airport Passenger Terminal with a capacity of 400 passengers/hour within the territory of SUE Termez International Airport
    3. No. 46

      Post-Construction Quality and Quantity Inspection for 2-storey Building Repair

      Client
      State company UzNIM under Uzstandard Agency
      Location
      Tashkent
      Team
      1 staff · 1 person-months
      Details
      • Post-Construction Quality and Quantity Inspection for “Current maintenance of 2-storey building of “UzNIM”
    4. No. 47

      Post-Construction Quality and Quantity Inspection Services - Reconstruction and Restoration of Historical Facilities in Khorezm region (Phase I) such as “Nurillaboy” and “Besh Khovli”, “Official Reception House” national iwans and khauzes (basins with pumps)”

      Client
      National Bank for Foreign Economic Affairs of the Republic of Uzbekistan
      Location
      Khiva
      Team
      1 staff · 2 person-months
      Details
      • Post-Construction Quality and Quantity Inspection for “Reconstruction and restoration of historical complex “Nurillaboy” in Khorezm region (Phase I), and particularly: “Besh Khovli”, “Official reception house”, national iwans, khauzes (basins with pumps)”
    5. No. 48

      Post-Construction Quality and Quantity Inspection of Fire Station Buildings and Facilities: Paramilitary fire safety unit – 10 TS on Navoi Street, Kibrai district, Tashkent region. Professional fire safety unit on Khamkorlik Street, Yukori-Chirchik district, Tashkent region. Professional fire safety unit – 28 in Parkent district, Tashkent region. Professional fire safety unit – 23 in Bostonlik district, Tashkent region

      Client
      Fire Safety Agency under Tashkent Regional Administration for Internal Affairs
      Location
      Tashkent region: Kibrai district, Yukori-Chirchik district, Parkent district, Bostonlik district
      Team
      1 staff · 1 person-months
      Details
      • Post-Construction Quality and Quantity Inspection for “Capital repair of building and fire station structure
    6. No. 49

      Construction Consultancy Support for International Hotel Reconstruction

      Client
      INTERSERVIS RXHTIB
      Location
      Tashkent
      Team
      2 staff · 1 person-months
      Details
      • Construction supervision on the Customer's site
    7. No. 50

      Consulting for "Construction of a residential complex"

      Client
      “PSK-2” Ltd.
      Location
      Tashkent
      Team
      1 staff · 12 person-months
      Details
      • Construction supervision on the Customer's site
    8. No. 51

      Post-Construction Quality and Quantity Inspection Services - Reshaping of Kindergarten No. 25 Premises

      Client
      «BOBIR-JAXON SAVDO SERVIS» Ltd.
      Location
      Tashkent
      Team
      2 staff · 1 person-months
      Details
      • Construction supervision on the Customer's site
    9. No. 52

      Construction supervision for: "Capital repair of the roof of Domestic Flights Terminal Tashkent-3"

      Client
      SUE Tashkent International Airport named after Islam Karimov
      Team
      1 staff · 3 person-months
      Details
      • Construction supervision on the Customer's site
    10. No. 53

      Construction supervision for "Reconstruction of old Domestic Flights Terminal and its extension to the Central Terminal of Tashkent International Airport named after Islam Karimov with a capacity of 500 pas/hour"

      Client
      SUE Tashkent International Airport named after Islam Karimov
      Location
      Tashkent city
      Team
      1 staff · 4 person-months
      Details
      • Construction supervision during construction of terminal building and access road and engineering communication
    11. No. 56

      Post-Construction Quality and Quantity Inspection of Mill, Warehouse, Administrative and Auxiliary Buildings and Structures

      Client
      MILL MAX GROUP Ltd.
      Location
      Tashkent
      Team
      1 staff · 1 person-months
      Details
      • Control measurement, preparation of an explanatory note, inventory reconciliation report and Control measurement report on the construction of plant and its access road.
    12. No. 57

      Project Management and Engineering Supervision for Educational Building Construction

      Client
      Tashkent International School
      Location
      Angren
      Team
      1 staff · 2 person-months
      Details
      • Preparatory works in accordance with the design and estimate documentation, construction supervision
    1. No. 55

      Construction Supervision for Liquefied Gas Composite Bottles Manufacturing Facility

      Client
      JV UNG ECONN Ltd.
      Location
      Angren
      Team
      1 staff · 1 person-months
      Details
      • Construction supervision during construction of manufacturing enterprise and its access road and engineering communication
    2. No. 54

      Post-Construction Quality and Quantity Inspection of Almalyk City Fire Rescue Unit No. 4 Buildings and Structures

      Client
      Fire Safety Agency under Tashkent Regional Administration for Internal Affairs
      Location
      Almalyk city
      Team
      1 staff · 1 person-months
      Details
      • Control measurement, preparation of an explanatory note, inventory reconciliation report and Control measurement report.
    3. No. 60

      Residential House Overall Façade and Soft Roof Post-Construction Quality and Quantity Inspection

      Client
      GOLDEN RICH GARDEN Ltd.
      Location
      Tashkent
      Team
      1 staff · 1 person-months
      Details
      • Within the project, a control measurement of general facade of the building and soft roof of residential building will be performed. The project cost is about 6 million soums.
    4. No. 61

      Supervision for National Metrology Institute Facilities Construction

      Client
      Uzstandart Agency
      Location
      Tashkent
      Team
      1 staff · 1 person-months
      Details
      • In the framework of the Project, overhaul repair of heating system and building of the laboratory, checking of high-voltage measuring instruments, repair of training room will be performed. The project cost is about 137.6 million soums.
    5. No. 59

      Construction Supervision of Buildings and Structures - Roof Covering Repair

      Client
      UzCarlsberg Ltd.
      Location
      Tashkent
      Team
      1 staff · 1 person-months
      Details
      • In the framework of the Project, it is foreseen to repair the roof cladding of buildings and facilities, located in the territory of UzCarsberg Ltd. The project cost is about 16 million soums.
    6. No. 58

      Construction Supervision for Access Roads and Intra-Plant Sites Rehabilitation

      Client
      UzCarlsberg Ltd.
      Location
      Tashkent
      Team
      1 staff · 2 person-months
      Details
      • Construction supervision for the repair of intra-plant sites and access roads.
    7. No. 62

      Post-Construction Quality and Quantity Inspection of Uzbek Economic Courts Video Conferencing System Facilities

      Client
      MARS SOLUTION Ltd.
      Location
      Tashkent, Andijan, Namangan, Fergana, Djizak, Surkhandarya, Samarkand, Bukhara, Syrdarya, Khorezm, Kashkadarya, Republic of Karakalpakstan
      Team
      6 staff · 25 person-months
      Details
      • Consultants conducted the control measurement of video-conferencing facilities in Economic Courts of Uzbekistan, where different video conferencing equipment have been supplied and installed.
    1. No. 63

      Bulungur Blast Chilling and Vegetables & Fruits Processing Plants Construction Supervision

      Client
      Samarkand Garden Plast Ltd.
      Location
      Samarkand
      Team
      2 staff · 12 person-months
      Details
      • Construction Supervision of the facilities - joint complex for processing of vegetables and fruits, which cultivated by the clients. The construction and design are implemented in parallel.
    2. No. 64

      Technical Supervision for Construction of Fruits and Vegetables One-Time Storage Refrigerator with a capacity of 4 500 tons

      Client
      JV Xalilov Sherzod Shavkatovich Ltd.
      Location
      Samarkand
      Team
      2 staff · 12 person-months
      Details
      • The facilities are joint vegetables and fruits processing complex, which grown by the Clients. Construction is carried out together with design. The type of building is typical.
      • Supervision for construction of Refrigerator for vegetables and fruits storage with capacity of 4,500 tons in Bulungur district of Samarkand region
    3. No. 65

      Renewing Detailed Design and Supervision for the Loan No.3275 UZB, Jizzakh Sanitation System Development Project

      Client
      ADB and Uzkommunkhizmat Agency
      Location
      Djizak
      Financing
      ADB
      Project partners
      SU-YAPI Engineering & Consulting Inc.(Turkey)
      Team
      4 staff · 130 person-months
      Details
      • The capital investment for the implementation of the DSSDP is estimated at US$91.00 million including physical and price contingencies. The impact of the project will be improved living standards, environment, and public health in Djizzak. The outcome of the project will be improved and expanded access to reliable, sustainable and affordable water supply and sanitation services.
    4. No. 66

      Construction Supervision for Beverage Production Power Supply Facility (PEPSI, Mirinda and 7up)

      Client
      International Beverages Tashkent Ltd.
      Location
      Andijan
      Project partners
      N\A
      Team
      2 staff · 3 person-months
      Details
      • Construction supervision for “Power supply of beverage industry of JV INTERNATIONAL BEVERAGES TASHKENT Ltd. in Sergeli district of Tashkent city”
    5. No. 73

      Business Centre Post-Construction Quality and Quantity Inspection

      Client
      Simvol Servis Story Ltd.
      Location
      Tashkent region
      Project partners
      N\A
      Team
      3 staff · 1 person-months
      Details
      • Control measurement of construction and installation works on the project 'Family Business Center Construction in the territory of SST named after Matkabulova, Kibray district of Tashkent region'
    6. No. 74

      Instrumental Survey for Administrative Buildings Reconstruction Design and Cost Estimates

      Client
      UNIVERSAL MOBILE SYSTEMS ltd.
      Location
      Andijan
      Project partners
      N\A
      Team
      3 staff · 1 person-months
      Details
      • Instrumental examination for design estimates development for Administrative Buildings Reconstruction A and B of UMS Co Ltd. in Andijan
    1. No. 68

      TA-8727 REG: Research and Development Technical Assistance for Study for a Power Sector Financing Road Map within Central Asia Regional Economic Cooperation

      Client
      ADB
      Location
      Astana, Tashkent, Ashgabat, Dushanbe
      Project partners
      PwC PL India
      Team
      4 staff · 8 person-months
      Details
      • The Study for a Power Sector Financing Road Map within CAREC, to be prepared under this technical assistance (TA), will assess the capacity and willingness of CAREC countries to finance power infrastructure development from their own resources, and examine other potential sources of financing for both national and cross-border projects. Any legal and regulatory framework in the region that may impede cross-border projects will be reviewed. In particular, the TA will identify power projects with public–private partnership (PPP) potential, and will highlight measures for stimulating private interest in the CAREC region's power sector.
    2. No. 69

      Modernization of Solid Waste Management System in Samarkand Region

      Client
      Agence Francaise (French Development Company)
      Location
      Samarkand
      Project partners
      NALDEO (France) – engineering company in the sphere of water supply, environment, energy, waste management and urban infrastructure
      Team
      4 staff · 8 person-months
      Details
      • Modernization of municipal system of household garbage utilization. Since medical non-hazardous, construction and industry waste is not always utilized separately in Samarkand, it is also concerned by the project.
    3. No. 67

      Syrdarya Water Supply Project - Implementation Support and Engineering Services

      Client
      SECO
      Location
      Syrdarya
      Project partners
      HOLINGER AG (Switzerland), UBI Consulting LLC (Uzbekistan)
      Team
      5 staff · 91 person-months
      Details
      • Rehabilitation of Beshbulok pumping station and well fields and connection of semi-rural settlements to the water main Reconstruction of the main pumping station. The overall objective of the investment Component is the provision of a functioning reliable water supply for the people of Gulistan and the people in the twelve semi-rural settlements along the pipeline between Beshbulok and Severnaya pumping stations (24h/day supply with 4'500 m3/h at pressure > 0.5 bar). This should be achieved through physical rehabilitation and upgrading of the Beshbulok pumping station and its well fields as well as the said pipeline.
    1. No. 71

      Development of Cost Estimates for Reconstruction of the Hospital buildings

      Client
      Save the Children, Korea
      Location
      Tashkent
      Team
      2 staff · 2 person-months
      Details
      • Civil Engineer should check current condition of training rooms in district hospitals in Kuyi – Chirchiq and Akkurgan districts by means of visit and visual assessment of facilities, evaluate needs in repair and conduct necessary measurements for identification of work volume and budget estimates.
    1. No. 72

      Post-Construction Quality and Quantity Inspection Services for the Reconstruction of the building

      Client
      Uzbekekspertiza
      Location
      Tashkent
      Team
      2 staff · 1 person-months
      Details
      • Providing services for the implementation of the control measurement object of the "Client", namely: control measurements performed overhaul of the facade of the administrative building of Uzbekekspertiza LLC.
    2. No. 70

      Water Supply and Sanitation Services Investment Program in Termez, including improvement of water supply and sanitation in Kokand City, modernization of Interregional Water Supply System “Damkhoja” and rehabilitation of water supply system in Gijduvan, Vabkent, Yangibazar and Peshku

      Client
      ADB and Uzkommunkhizmat Agency
      Location
      Termez
      Financing
      ADB
      Project partners
      EPTISA (Spain)
      Team
      2 staff · 40 person-months
      Details
      • Reconstruction of the main pumping station. Reconstruction of aerobic stabilizer, replacement of pipeline equipment. To fill secondary sedimentation tanks with water. Reconstruction of contact tanks, replacement of pipe system equipment and armature. Reconstruction of primary sedimentation tanks, replacement of pipe system and armature. Reconstruction of sludge beds, cleaning the pipes, replacement of armature, replacement of gravel-sand-loading trays. Cleaning water wells, replacement of equipment. Replacement of pipeline of technological communications. Reconstruction of checkpoint. Reconstruction of machine repair shop. Boiler was incapacitated.